Tag Archives: Nuclear safety

The Japanese Sendai Nuclear Plant Threatened by the Sakurajima Volcano


Myself

By T.V. Antony Raj

.

The lithosphere is the rigid, outermost shell on Earth. It comprises the crust and the part of the upper mantle that has an elastic behavior on, timescales of thousands of years or greater.

The scientific theory of plate tectonics describes the large-scale motion of Earth’s lithosphere. The geoscientific community accepted the theoretical model of plate tectonics developed during the first few decades of the 20th century based on the concept of continental drift. The concepts of seafloor spreading developed in the late 1950s and early 1960s.

.

The tectonic plates of the world were mapped in the second half of the 20th century.
The tectonic plates of the world were mapped in the second half of the 20th century.

.

The Earth’s lithosphere, the rigid outermost crust and upper mantle, is broken up into seven or eight major tectonic plates and many minor plates.

These massive slabs of the earth’s crust forever creep, slip, lock up and then jolt again. The typical annual lateral relative movement of the plates varies from zero to 100 mm.

Almost all creation of mountains, earthquakes, volcanic activity, and the formation of oceanic trenches occurs along these tectonic plate boundaries.

The islands that compose the Japanese nation sit on or near the boundary of four tectonic plates: the Pacific, North American, Eurasian and Filipino plates.

.

The Pacific Ring of Fire
The Pacific Ring of Fire

.

Also, Japan lies on the “Ring of Fire” also known as the circum-Pacific belt.  –  The Ring of Fire is a horseshoe-shaped band of fault lines in the basin of the Pacific Ocean, associated with a continuous series of oceanic trenches, volcanic arcs, and volcanic belts and  tectonic plate movements.  It has 452 volcanoes and has over 75% of the world’s active and dormant volcanoes. A large number of earthquakes and volcanic eruptions occur in this region.

Sendai Nuclear Power Plant

.

The Sendai Nuclear Power Plant (Source: power-eng.com)
The Sendai Nuclear Power Plant (Source: power-eng.com)

.

The Sendai Nuclear Power Plant, owned and operated by the Kyūshū Electric Power Company, is in the city of Satsumasendai in the Kagoshima Prefecture.  It is located near five giant calderas, a cauldron-like volcanic feature usually formed by the collapse of land following a volcanic eruption, with the closest one about 40 km away from the plant.

Before the earthquake and tsunami of March 2011, and the nuclear disasters that resulted from it, Japan had generated 30% of its electrical power from nuclear reactors. It had planned to increase electrical power production to 40%.

Nuclear energy was a national strategic priority in Japan, but there had been concern about the ability of Japan’s nuclear plants to withstand seismic activity.

The earthquake and tsunami of on March 11, 2011, caused the failure of the cooling systems at the Fukushima I Nuclear Power Plant.  Japan then declared its first-ever nuclear emergency. This caused the evacuation of around 140,000 residents within 12 miles (20 km) of the plant.

On May 6, 2011, Prime Minister Naoto Kan ordered the shutdown of the Hamaoka Nuclear Power Plant as an earthquake of magnitude 8.0 or higher is likely to hit the area within the next 30 years.

Also, many other nuclear power plants, including the Sendai plant stopped  generating electricity.

In the wake of the Fukushima Daiichi nuclear disaster in 2011, Japan set new safety standards for its nuclear reactor plants.

On September 10, 2014, the Japanese Nuclear Regulation Authority (NRA) declared the Sendai Nuclear Power Plant safe for operation.

On August 11, 2015, Kyushu Electric Power Co., restarted its operation by bringing online the No. 1 reactor at its Sendai power station according to the new safety standards. Now it is providing power to the nearby towns again. Sendai is the first of Japan’s nuclear power plants to be restarted.

The Sakurajima Volcano

.

View of Sakurajima from mainland Kagoshima in 2009
View of Sakurajima from mainland Kagoshima in 2009

.

Sakurajima is an active composite volcano (stratovolcano) 990 km southwest of Tokyo. It is a former island in Kagoshima Prefecture in Kyushu, Japan. It is one of Japan’s most active volcanoes and erupts all the time. The lava flows of the 1914 eruption caused the former island to be connected to the Osumi Peninsula. The volcanic activity still continues, dropping large amounts of volcanic ash on the surroundings. Earlier eruptions built the white sands highlands in the region.

The Japan Meteorological Agency  on its website said that it believes that a larger than the usual eruption could be in the offing since it detected multiple earthquakes in the area on Saturday morning.  So, on Saturday, August 15, 2015, the agency raised the warning level for the volcanic island of Sakurajima from Level 3 to an unprecedented Level 4 (red). It has warned the residents in the villages on Sakurajima and has advised them to evacuate since stones could rain down on areas near the mountain’s base.

The Kagoshima prefectural government has formed an emergency response team.

The Kyushu Electric Power Company says a possible eruption on Mount Sakurajima will not affect the operation of its Sendai Nuclear Power Plant. The company made the comment after raising the alert level to 4. They said that they will collect the relevant data while proceeding with work to increase output as planned.

The Japanese Nuclear Regulation Authority (NRA) also says any possible eruption of the Sakurajima volcano will not affect the Sendai Nuclear Power Plant.

.

.

RELATED ARTICLES

 

 

Stop Kudankulam fuelling, lives are at stake!


By Dr. A .Gopalakrishnan (a past chairman of the Atomic Energy Regulatory Board)

English: Internationally recognized symbol. De...

The government, through its Department of Atomic Energy (DAE), the Nuclear Power Corporation Limited (NPCIL), and the Atomic Energy Regulatory Board (AERB) is racing to bring the Kudankulam Nuclear Power Project, Unit-1 (KNPP-1) to full-power operation at the earliest. The questions predominantly troubling the conscientious public today are simply these: Is the Kudankulam Unit-1 ready for introduction of nuclear fuel assemblies into its core (‘fuelling’), having fully completed all the safety modifications and additions recommended by AERB’s Post-Fukushima Committee to Review Safety of Indian Nuclear Power Plants? What other mandatory, pre-fuelling safety-related tasks such as conducting proper emergency drills in villages within a 30 km-radius of the reactors remain? What are the serious implications to public safety if NPCIL and AERB move forward with fuelling activity and bring this reactor to its full power of 1000 MWe in the current state of inadequate and incomplete safety status?

On some of the glaring defaults of the current actions of the DAE, NPCIL and the AERB vis-à-vis KNPP-1, there are three Special Leave Petitions (SLPs) currently before the Supreme Court of India. The next hearing of one SLP that seriously pleads for stopping fuelling activity is set for September 27. As early as on March 26, 2012 , a writ petition (no. 8262) was filed in the Madras High Court for a direction against the DAE, NPCIL, AERB and others to implement all the recommendations of the AERB’s Post-Fukushima Report before fuel-loading is started. In response, the AERB counsel informed the court , “— that before initial fuel loading is done, the compliance of all the requirements under Annexure-8 (of the AERB report) will be ensured by the AERB and it is only after its satisfaction any direction (for loading fuel) will be given—” . Subsequently , the High Court decided to reserve its orders on August 2, 2012 , pending detailed judgement to follow.

n the interim, since the court had not imposed any stay on actions by NPCIL and AERB, chairman, AERB, used this opportunity to issue a clearance for initial fuel loading of KNPP-1 on August 10 after reviews by their internal committees. The original petitioner then filed yet another writ petition (no. 22253) in the Madras HC on August 13, challenging the fuel-loading clearance given by AERB, even while 11 out of the 17 safety recommendations of the AERB’s Post-Fukushima Report still remained to be implemented. AERB, in reply to this writ petition, submitted two affidavits, first one on August 18 and another on August 22.

he post-Fukushima evaluations by an independent AERB committee, headed by a past chairman of the AERB had recommended 17 safety upgrades in Annexure-8 of its report. The committee, however, did not sort these on the basis of relative importance, urgency or priority. The sense you get from this report is that all 17 corrective steps are equally important and AERB must insist on all of them being fully implemented and tested before fuel-loading is permitted. This is consistent with the affidavit earlier submitted to the Madras HC by Mr R. Suresh Kumar, counsel for AERB, “ — that before initial fuel loading is done, the compliance of all the requirements under Annexure-8 will be ensured by the AERB and it is only after its satisfaction that any direction will be given—–” .

However, in their affidavits to the same court on August 18 and 22, AERB reversed its stand by stating, “—recommendations in Annexure-8 of the Post-Fukushima Report were considered (by the internal AERB committees) during review of the application for fuel loading submitted by NPCIL. The review indicated that KNPP-1 has adequate safety measures against external events — In order to further enhance safety , as an abundant measure , some additional safety enhancements proposed by NPCIL were reviewed in depth and accepted for implementation in a phased manner.”

“Based on the review and resolution of NPCIL submissions, AERB agreed for short-term (less than six months) and long-term ( less than two years) implementation of the Post-Fukushima recommendations from the date of the fuel-loading clearance”.

Ultimately, the Madras HC did not agree with the plea of the protesters for full implementation of Annexure-8 safety steps before fuel loading is initiated and the matter is now being heard by the Supreme Court. Even as the Supreme Court hearings are going on, the NPCIL and the AERB are already loading the nuclear fuel into KNPP-1.

What the AERB has done is a total volte face of its earlier stated positions in the Madras HC, and contrary to the spirit and recommendations of the AERB Post-Fukushima Safety Evaluation Committee.

This has happened because the DAE, NPCIL and AERB appear to be under the direct control of the PMO on the Kudankulam issue, and none of them dares to take any decisions on their own.

The PM, is for months accused in the national and international press for India’s policy paralysis, the dwindling performance of the power sector, and for substantial slippage in the execution schedules of many major projects. During his last two visits to Russia, the PM promised expeditious completion of KNPP-1&2. The local protests at site have put a monkey wrench into his promises and timetable. PM and his PMO consider their face-saving to be more important than the possibility of imperiling the lives of people living near KNPP-1, and appear to have clearly instructed the DAE-AERB combine to rush through with commissioning the plant. The subservient DAE and AERB seem to be complying with his directions.

In this hurried approach to starting the KNPP-1 project, what essential safety precautions are the NPCIL and AERB tossing by the wayside? As per current plans, the reactor will be operated at least for the first two years or more at the full power level of 1000 MWe, without its primary containment being assessed for its ultimate load-bearing capacity; without the availability of a portable diesel-powered unit with sensors and instrumentation to monitor essential safety parameters in case of a total blackout; in the absence of a set of mobile self-powered pumping set for emergency area use; without rectifying the serious inadequacies in instrumentation for independent monitoring of plant status during major accidents; and without the addition of mobile back-up power units like air-cooled diesel sets. Why each of these actions should take as long as 24 months to complete is unimaginable, but these actions have to be indeedexpedited, since they are all essential for mitigating the consequences of a major accident.

The AERB committee has also strongly recommended the urgent installation of an additional seismically-qualified 8,000 cubic-meter capacity back-up water storage tank as an alternate source for use under emergency situations where such actions as injection of borated water into the core and into the spent-fuel pool, charging water into the steam generator secondary side, etc will require excessive amounts of water. The already provided emergency water-storage facility has not been seismically-qualified and may not withstand moderate earthquakes. This anomaly has to be urgently rectified through analysis and repair. This existing storage was also found to be inadequate in holding capacity , for removing decay heat for a period of a minimum one week . This too is to be rectified. In case of a beyond design basis accident (BDBA), the emergency operating procedures to be used are still to be formulated and documented, to help impart training on BDBA to the operating staff.

It is more than 16 months since the Fukushima accident occurred and NPCIL has not even started planning for these procedures. Each of the above tasks is put in for “short-term” completion, namely, within the next six months. I doubt whether a satisfactory completion of many of these tasks can be achieved in six months, each may take more like one year at least.

As it stands, the important point to note is that NPCIL and AERB are NOT going to carry out any of the short or long-term tasks mentioned above, before the reactor is fuelled and brought to 1000 MWe power level. This approach is totally unacceptable from the safety point of view. Whether these 17 safety corrections are implemented or not, the probability of a major accident will remain more or less the same. But, ALL these safety corrections are necessary to ensure that the mitigation of the consequences will be far more acceptable with the corrections implemented than without, and these safety corrections will provide a distinctly safer environment for populations around the KNPP-1. Therefore, ALL the above-mentioned long-term and short-term safety corrections recommended by the AERB committee must be completed before the reactor is fuelled. Whatever fuel so far loaded into the core can be taken out safely and stored for future use.

The author Dr. A. Gopalakrishnan is a past chairman of the Atomic Energy Regulatory Board (AERB).

Reproduced from DNA

Add this anywhere

Enhanced by Zemanta

Kudankulam: Antinuclear Fishermen lay siege to Tuticorin port


Written by Sam Daniel, Edited by Mala Das

September 22, 2012

Anti-nuclear protesters lay siege to Tuticorin port
Anti-nuclear protesters lay siege to Tuticorin port

Protests against the Kudankulam nuclear plant continue unabated with thousands of fishermen having laid siege to the port at Tuticorin today, demanding the closure of the controversial plant.

Nearly thousand fishing boats have blocked entry to the Tuticorin harbour, which is situated around 60 miles away from the nuclear power plant. The loading of nuclear fuel, which is on at one of the reactors at the Kudankulam plant, has not in the least dented the determination of the protesters, all fishermen hailing from the districts of Tuticorin, Kanyakumari and Tirunelveli – where the plant is located.

“Fishermen in Kudankulam and surrounding districts are protesting over the last 400 days, but the government is not listening and we will have to resort to these kind of protests,” said a fisherman. These fishermen are worried that the plant, once commissioned, will destroy their livelihood. Subash Fernando, Spokesperson of the Agitation Committee, says, “Once the plant is commissioned, the radiation from it would disqualify our catch for export to the European market, and even if nuclear fuel is loaded, it’s not too late to stop it”.Two expert committees appointed by the government have found the plant to be safe, dubbing public fears unfounded.

Tamil Nadu Chief Minister J Jayalalithaa, who initially supported the cause of the movement, later did a U-turn, citing that the project could bring relief to the state which is reeling under a severe power shortage. Around a lakh and half people, who live in the vicinity, are opposed to the plant. “If India believes in democracy, the government should listen to the people.

If Japan could have a Fukushima disaster, imagine what could happen in India which was also hit by a tsunami not long ago,” said a villager. Presently, the Supreme Court is hearing a petition that challenges the go-ahead given to the nuclear plant. Petitioners cite that the plant is yet to incorporate 11 of the 17 safety recommendations made by a government task force after the Fukushima disaster.

However, the atomic energy department claims these are only enhanced safety features which would be implemented in phases. At Idinthakarai – ground zero for the protests – just three kilometres away from the plant, around four to five thousand villagers are continuing their protest demanding the closure of the plant. Two weeks ago, around 10 thousand people marched towards the plant in a bid to lay siege; police opened tear gas and resorted to lathicharge to disperse the crowd.

A non-bailable warrant has been issued against SP Udhayakumar, the face of the movement, as he failed to honour a court summon. He says “the government is trying to project them as the most wanted terrorists”. The Kudankulam power plant is the first nuclear project to near completion after the Fukushima disaster. Some countries like Germany have decided to turn away from nuclear energy and the international community is keenly watching how India handles the rising opposition to the project..

Reproduced from ndtv.com

.

Videos to see:

Protests against the Kudankulam nuclear plant continue unabated with hundreds of fishermen having laid siege to the port at Tuticorin today, demanding the closure of the controversial plant.

Around 200 anti-nuclear activists were detained today in Tuticorin, while they were heading to Idinthakarai, the venue of protest against the Kudankulam nuclear plant in Tamil Nadu. The activists were set to join the villagers who have buried themselves neck-deep in sand along the shore, demanding a halt to the preparations for loading of fuel into one of two nuclear reactors at the controversial plant.

Around 1000 villagers near Kudankulam, including women and children, buried themselves neck deep on the sea shore protesting against the upcoming nuclear plant. Over the last one year they have been demanding closure of the plant alleging the project would destroy life and livelihood. Two expert committees have found the plant to be safe. The Supreme Court too has refused to stay nuclear fuel loading.

Hundreds of anti-nuclear protesters forming a human chain stood in sea waters for the second day today demanding halting of preparations for fuel loading into the Kudankulam nuclear reactor in Tamil Nadu.

Related articles

Enhanced by Zemanta

Add this anywhere

Kerala and Tamilnadu Police Block Kerala Intellectuals’ Antinuclear March to Koodankulam


Kerala-Kudankulam march led by Sugathakumari, Sara Joseph and K Ajitha.
Kerala-Kudankulam march led by Sugathakumari, Sara Joseph and K Ajitha. Photo: Deccan Chronicle

On Sunday, September 16, at Inchivila on the Kerala-Tamilnadu border, Kerala police stopped over 200 Kerala antinuclear protesters from proceeding to Kudankulam. The protesters led by prominent writers, environmental and social activists, responded to a call for support from the fisher folk of Kudankulam.

At Parassala, Malayalam poetess Sugatha Kumari inaugurated the March organised by the Kerala Anti-Nuclear Support Group. She said the agitation against the Kudankulam nuclear power plant should not be left to the local villagers living around the nuclear plant. She recalled how the people of Kerala stalled the nuclear plant planned in Peringom, in North Kerala.

Writer Sarah Joseph addresses the Kudankulam Solidarity march at Parassala near Thiruvananthapuram on Sunday. Photo: The Hindu

Writer Sarah Joseph pointed out that opposition to the nuclear power plant was gaining in strength with the former chairman of the Atomic Energy Commission coming out against it. Therefore, the Prime Minister’s suggestion that the emotional and mental health of the agitating local villagers ought to be checked had forfeited its validity.

The stopped marchers led by poet Sugathakumari, writer Sarah Joseph, Vicar-General Fr. Eugene Pereira of the Thiruvananthapuram Archdiocese, former diplomat M.K. Bhadrakumar, and social activists K. Ajitha, B.R.P. Bhaskar, C.R. Neelakantan, Vilayodi Venugopal, Gandhian P. Gopinathan, and N. Subramanian, staged a sit-in on the highway.

Even after the police action, 60-odd activists of the Kerala Anti-Nuclear Support Group, which organised the March, proceeded to Kudankulam by bus. However, Tamilnadu police stopped them at Anchugramam. Even so, a small group went to Nagercoil and attempted to reach Kudankulam in a private bus.

.

Enhanced by Zemanta

This renaissance is just a fairy tale


English: Internationally recognized symbol. De... Nuclear power plant symbol Fukushima *

Reproduced from 

Author: Nityanand Jayaraman

June 15, 2012

The unpredictable financial implications of constructing, running, decommissioning plants and handling risks are causing a global rethink on nuclear energy

For a professed proponent of liberalisation and free trade, Prime Minister Manmohan Singh’s penchant for a technology that cannot float without subsidies is telling. Nuclear power’s unfavourable economics are not lost on Dr. Singh.

Recently, Westinghouse Electric and Nuclear Power Corporation of India Limited (NPCIL) signed a Memorandum of Understanding (MoU) to negotiate the setting up of AP1000 reactors in Gujarat, ending a slump in interest from the Toshiba subsidiary in India’s nuclear market. For Toshiba’s Westinghouse and other nuclear equipment suppliers, the Civil Nuclear Liability Act’s clause on supplier liability was the key hurdle to investing in India. The companies wanted the Indian government to insulate them from the financial fallouts of any potential disaster caused by their technology by spreading that liability among taxpayers. The recent MoU suggests some progress in moving towards this goal.

More obstacles remain, though. Nuclear projects are un-bankable. The government may deploy mental health specialists to deal with the fears of Kudankulam protestors. But those shrinks are unlikely to be able to allay the fears of financiers or nuclear equipment suppliers.

According to nuclear energy expert Peter Bradford, “The most implacable enemy of nuclear power in the past 30 years has been the risk not to public health but to investors’ wallets. No nuclear power project has ever bid successfully in a competitive energy market anywhere in the world.” Mr. Bradford was member of the U.S. Nuclear Regulatory Commission and chair of the New York and Maine electricity regulatory commissions. He teaches a course on nuclear power at the Vermont Law School.

Second thoughts

Unpredictable financial implications associated with constructing, running, decommissioning plants and handling nuclear risks are causing a rethink on nuclear energy worldwide. But these developments seem to slip by India without so much as causing a ripple.

Germany and Switzerland have decided to phase out nuclear power, despite their substantial dependence on it. Israel abandoned its year-old civilian nuclear programme after Fukushima. Belgium revived a pre-Fukushima decision to phase out nuclear power, using the Japanese disaster as a reminder. Italy and Kuwait gave up their nuclear debut by abandoning plans for 10 and four plants respectively. Mexico dropped plans for constructing 10 plants. All of Japan’s 54 reactors are now closed, and plans for 14 new reactors killed.

The story of nuclear energy’s unviability is told not just by the actions of naysayers, but also by the experiences of those — like Egypt, Saudi Arabia, Jordan, Iran, Turkey, Vietnam and South Africa — pursuing nuclear programmes. All of them want the nuclear option, but have no idea how they will finance it.

If the U.S. is Dr. Singh’s inspiration, then the so-called nuclear renaissance’s trajectory in that country gives even more cause for despair. In 2009, the U.S. declared a nuclear revival with promises of more than 30 new reactors. Today, most of these projects are doomed. Even candidates for federal loan guarantees such as the South Texas project, and the Calvert Cliffs-3 project in Maryland, have been mothballed.

State governments in the U.S. do not seem to share the Federal Government‘s enthusiasm for nukes. Bills to reverse moratoria on nuclear plants in Minnesota, Kentucky and Wisconsin failed last year. In Missouri, North Carolina and Iowa, legislators defeated bills to charge electricity consumers in advance to finance reactors.

“At the time of Fukushima, only four countries — China, Russia, India and South Korea — were building more than two reactors. In these four nations, citizens pay for the new reactors the government chooses to build through direct subsidies or energy price hikes,” Bradford notes.

Finland was among the few that reiterated its commitment to nuclear power after the Fukushima disaster. The 1,600 MW Olkiluoto nuclear plant uses French company Areva‘s technology. Areva’s modular design was expected to make it faster and cheaper to build. But 11 years later, the project is behind schedule and its $4.2 billion budget is up now by 50 per cent. After Fukushima, Areva admits that the same plant would cost $8 billion. Even Areva’s home project, in Flamanville, France, has suffered a $4 billion cost overrun and a four year delay. Indeed, 31 out of 45 reactors that were being constructed globally around 2009 were either delayed or did not have official dates for commissioning, says a report for the German Government by consultant Mycle Schneider.

In India

In Kalpakkam, meanwhile, the Prototype Fast Breeder Reactor was slotted to contribute to the grid in March 2012. In 2005, Baldev Raj, Director of the Indira Gandhi Centre for Atomic Research, Kalpakkam, boasted that the 500 MW unit will be completed in 2010, 18 months before schedule. Till date, there is no sign of this happening. The Kudankulam plant, which is now 23 years old since conception, lost only eight months due to protestors.

In Jaitapur too, the government has more to worry about than local protestors. Areva, the technology supplier, is in trouble. Last year, it announced losses of €1.6 billion, and the sacking of 1,200 workers in Germany. Last June, it decided to suspend production at a Virginia reactor component plant due to declining market prospects. Its expansion plans in France, the United Kingdom, and the U.S. may never materialise. Areva expected to sell 50 nuclear reactors this decade. It has not received a single order since 2007.

Now, with a socialist president at the helm in France, Areva’s future looks even more uncertain. French President François Hollande had promised voters a reduction in nuclear dependence from 75 to 50 per cent, and shutdown of an aging reactor in Fessenheim. Whether or not he carries through with these promises, it appears certain that no new plants will be built or planned during his term. Both conservative-led Germany and socialist France will make up the shortfall from the nuclear phase-out, by investing in renewables for electricity and new jobs. In replacing nuclear with renewables, these nations are declaring that despite its carbon dividend, nuclear is too risky — financially, politically and environmentally — to pursue.

(Nityanand Jayaraman is an independent writer and volunteer with the Chennai Solidarity Group for Kudankulam Struggle.)

Enhanced by Zemanta

Add this anywhere

Dear Prime Minister, Your Advisors on Nuclear Energy Are Lying to You !!


 Reproduced from DiaNuke.org

Antinuclear logo

To

Dr. Manmohan Singh
The Prime Minister of India,

Dear Prime Minister,

As per some press reports (The Hindu May 16, 2012) you told the Parliament on Wednesday 16/05 that,

“Germany, which had announced that it would close down all its all nuclear plants by 2022, bought electricity from France, a country that relied heavily on atomic energy.”

But this is just the opposite of the truth!

Since 2004, France has always been a net importer of electricity from Germany. The quantity of electricity purchased by France from Germany every year has been between the equivalent production of one or two nuclear reactors.

2004 : 8,7 TWh

2005 : 9,6 TWh

2006 : 5,6 TWh

2007 : 8,2 TWh

2008 : 12,6 TWh

2009 : 11,9 TWh

2010 : 6,7 Twh

You can find this information here (and use internet translation from French to English if required):

And you can further verify the information from the original source (RTE, the French government-owned power distribution company) in the links quoted in the article.

Please note that, although some sources in the previous French government had predicted that Germany would start becoming a net importer of electricity from France after they decided in 2011 to shut down in a planned manner their oldest nuclear plants, this prediction did not happen, and during the last winter, Germany was not only self-sufficient after closing 8 nuclear reactors, but was even capable to help “Atomic France”.

The information is in the same website as above, and the original data can be also verified.

Dear Prime Minister, I don’t know from where you get information on nuclear energy, but from now on, please connect yourself to the internet and personally check the facts about nuclear energy. You may object that as Prime Minister you are too busy to get educated on nuclear energy.  But in the present situation, it is possible that there may be no other way for taking wise decisions on this issue which is so crucial, not only for the economy but for the future of us all on this earth.

It took me 10 minutes of internet search to find the details above!

There are plenty of serious websites, in all languages, from where the information can be cross-checked and verified.

Respectfully Yours,

Laurent Fournier
1/22-E Chittaranjan Colony
Jadavpur, Kolkata-32

For the record, this is the press report from where I read your
statement in Parliament.

Enhanced by Zemanta

Dear Prime Minister, are you listening to the right people, Sir?


Antinuclear logo

Reproduced from DiaNuke.org

REBUTTAL TO ‘SAFETY’ CLAIMS MADE BY PM MANMOHAN SINGH ON MAY 16, 2012

By Anuj Wankhede

The Prime Minister of India – on Wednesday May 16, 2012- made a statement on the floor of the House regarding the safety of the civilian nuclear facilities in the country.

Even WITHOUT a natural disaster, here is a list of publicly available Civilian Installation incidents that have already occurred within the country.

How dare he mislead the nation in this way? Nuclear accidents are not road and railway accidents, which happen almost daily in our country.

Why are you considering data only AFTER Fukushima? And telling the House that we are safe?

Here is our previous to Fukushima record –

4 May 1987 – Kalpakkam
Fast Breeder Test Reactor at Kalpakkam.
Refueling accident ruptures the reactor core resulting in a two-year shutdown.

10 Sep 1989 – Tarapur, Maharashtra
After operators at the Tarapur Atomic Power Station find reactor leaking radioactive Iodine at more than 700 times normal levels, repairs to the reactor take more than a year.

13 May 1992 – Tarapur, Maharashtra
A malfunctioning tube causes the Tarapur Atomic Power Station to release 12 curies of radioactivity.

31 Mar 1993 – Bulandshahr, Uttar Pradesh
The Narora Atomic Power Station suffers a fire at two of its steam turbine blades, damaging the heavy water reactor and almost leading to a meltdown.

2 Feb 1995 – Kota, Rajasthan
The Power Station leaks radioactive helium and heavy water into the
Rana Pratap Sagar River necessitating a two-year shutdown for repairs.

22 Oct 2002 – Kalpakkam
Almost 100 kg radioactive sodium at a fast breeder reactor leaks into a purification cabin, ruining a number of valves and operating systems.

Sir, you ‘may’ be a honorable man. But then who is giving you wrong information? As a man of economics, you may not be aware of the seriousness of these incidents.

We, the citizens of the country, fear for the worst, especially considering the disastrous experiences of past accidents and natural disasters in India.

We do not expect timely relief.

We do not expect evacuation.

We do not expect rehabilitation.

We do not expect compensation.

We do not expect justice.

We do not even expect truth from the establishment.

We ONLY EXPECT YOU TO STOP THIS NUCLEAR MADNESS.

We will tell you the ways to progress without Nuclear Energy. We have enough scientists who say NO to nuclear power and who are willing to show you the way.

Are you listening, Sir?
Your democracy asks you!

RELATED ARTICLES
Enhanced by Zemanta